A home addition is a wonderful way to transform your current property and ensure you have all of the space your family needs. No matter whether you are expanding your kitchen, adding a new bedroom, or creating a cozy home office, home renovations in Cleveland, Ohio, are incredibly popular, but how long do these projects usually take?
As one of the leading providers of home renovations in the local area, our experienced Tyger Remodeling team has put together a short overview of what you can expect.
Planning and Design (two months)
This is the most important stage of any home remodeling project in Cleveland, Ohio, and it is vital that you do not rush this aspect. It is during this stage that you will conceptualize your ideas, begin consulting with designers and architects, and source the necessary permits.
The typical time for this stage will be around two months; however, depending on the complexity of your project and the building regulations you need to adhere to, this can take longer. Make sure that you take your time to thoroughly plan and design your home addition, as this will help make the rest of the project as smooth as possible.
Site Preparation (up to four weeks)
Once you have been able to finalize your designs and plans and secure all the required permits for your home addition, the next step is to prepare the worksite. The duration of this period will depend on the size of the project you are undertaking and will see the area being cleared, temporary structures set up, and any grading and drainage issues addressed. On average, this will take around two weeks, but it can take longer as needed.
Foundations (four weeks)
Your foundations are the backbone to your home addition and its construction is critical to the entire process. That is why the foundation work cannot be rushed, and the duration will depend on a range of factors, including the type of foundation required and the local soil conditions. On average, this process will take around two to four weeks depending on the size.
Framing (varied)
Framing is the skeleton of your home addition, and is the time when you’ll see your vision start to take shape. This phase will involve erecting structural framework such as the walls, floors, and roof. Again, the duration of this phase will depend on the size of your extension and the complexity of the project. This phase could take anywhere from a few weeks up to several months.
Exterior finishing (three weeks)
Once the framing is complete, the next phase is to finish the exterior of your home addition. This is the time when your contractors will install things such as the roofing, siding, windows and doors. The timeline for the exterior finishing will vary depending on the materials that have been chosen, the intricacy of the design, and the size of your extension. Quite often, this phase will be around three weeks.
Interior finishing (several weeks)
Once the exterior is done, attention will turn to the interior, and this is where you can truly personalize your approach. This will see the drywall and flooring installed, before painting, decorating, and fixtures are installed. This phase can sometimes start while contractors are completing the exterior, and it will usually be several weeks before everything has ben completed.
Final inspection (one week)
Before you are ready to move in and start using your new home addition in Cleveland, Ohio, you will need to have a final inspection. This will allow you to identify any errors that need fixing to ensure that every detail meets your expectations.
In need of a home addition?
If you are in need of a home addition in Cleveland, Ohio, Tyger Remodeling is here to help you. We specialize in residential construction, helping our clients to transform their property and create a space that their whole family loves.
So no matter whether you are looking for a kitchen extension, bathroom remodeling, or basement renovation, get in touch with our team today to find out more!